ARC

Anaheim Rapid Connection is a fixed-guideway transit system currently in the Alternatives Analysis process that will connect Anaheim area destinations like never before. Starting at ARTIC, this new system will take visitors, high-speed rail riders, employees and area residents to and from the Platinum Triangle, The Anaheim Resort and the Anaheim Convention Center. With ARC it has never been easier for conventioneers to catch a ball game, out-of-towners to get to Disneyland, residents to dine at The Shops at Anaheim GardenWalk, or thousands of area employees to get to and from work – all without having to drive.

Work is currently underway preparing an Alternatives Analysis Report. Alternatives under review include an Enhanced Bus, a Streetcar and an Elevated Fixed-Guideway.

View Documents and Information Regarding Anaheim Rapid Connection (including the September 12 Community Meeting presentation and the October 3, 2012 Alternatives Analysis Report) at: http://www.anaheim.net/title/Public+Works/Transit+Planning/page.htm

GET THE LATEST UPDATES & NEWS

Public Input Invited - Anaheim Rapid Connection Transportation Project
The public is invited to attend a community meeting to learn more about the Anaheim Rapid Connection (ARC), a proposed transit system, and to provide input on alternatives under consideration. The meeting will take place on Wednesday, September 12 at the Anaheim Convention Center, Room 213A… Read more 

ARC Transportation System Receives Bids for Consultant Services Transportation systems by which residents, commuters and visitors can get where they want to go in and around Anaheim’s major destinations without ever needing a car remains a priority for the City. One transportation project currently under review is the Anaheim Rapid Connection (ARC) fixed-guideway system… Read more 

Connect with the ARC Project
info@anaheimfixedguideway.com
Twitter
Key Facts

ARC will be a high-capacity approximate 3.5 mile system, providing convenient and efficient transfers to Metrolink, Amtrak, local bus and future bus rapid transit and high-speed train services connecting to ARTIC.

During the construction phase, thousands of jobs will be created.

It will relieve traffic on local freeways and roadways, improve air quality and reduce greenhouse gases.

By investing in much-needed infrastructure and congestion relief, ARC will enable future growth.

Upcoming Milestones
Underway Alternatives Analysis/Conceptual Engineering

2013 Environmental Clearance

2014 Preliminary Engineering Begins

2014 - 18 Preliminary Engineering Completed/Final Design/Construction

2018 Completion